Aluminum Cladding Vertical Installation Guide

Enjoy the enduring beauty of Jayminton Cladding in the bush, by the beach or in full sun. Effortless to install and maintain,Jayminton Cladding is the ultimate in exterior cladding. The following installation guide outlines a range of installation techniques. If you require further assistance, please contact us.
Vertical Applications
1. Apply Sarking or Building Wrap and Any Additional Battens or Noggins Required
When installing battens for a horizontal cladding facade, position the battens vertically with a spacing of 600mm between centres.
| Label | Description |
| A | Frame |
| B | Battens/ Thermal Break (if required) Ensure frame can provide fixings for every 600mm (may need to alter the frame to satisfy needs). |
| C | Sarking/ Building Wrap |
2. Cover Strip Setup
a) Install cladding accessories including End Cover Channels, 20×20 Angles, Joining Connectors, 20×20 Tee Sections and
Internal or External Corners. When installing ensure all extrusions are fixed at maximum 600mm centres or as required for the
applicable wind loads.
b) Measure and cut vertical cladding accessories to length including, Starter Strip and Cover Strip Base.
| Label | Description |
| A | End Cover Channel |
| B | Cover Strip Base |
| C | End Cover Channel |
| D | External Corner |
NOTCHING DETAIL FOR END COVER CHANNEL
When applying the End Cover Channel to the bottom edge of the cladding area, the rear wall will need to be notched (as seen in
Detail 3 and 4) in order to allow full coverage on the front face. Alternatively, the Cover Strip Base and Clip could be applied as depicted in Detail 1 and 2 to the bottom edge.
NOTE: Areas highlighted red are to be notched.
3. Install First Board
Measure, cut and install first board by positioning lip over the starter strip and fix board using 30mm 10G screws as required for your application. To ensure that the board has the required movement, the fixings are required to be installed through the pre-punched slots. Failure to do so may result in excessive stress and failure of the fixing.
| Label | Description |
| A | Pre-punched slot |
| B | 30mm x 10G Self Tapping Panhead or Button head screws (galvanised or stainless steel) |
CUTTING TIP
When cutting the boards to length, one method of ensuring that you have adequate coverage is to measure the distance available in the internal dimension (x) of the End Cover Channel to the end of the cover strip base and subtract 5mm. (See diagram)
Length of Board = x – 5mm
Length of Cover Strip = y – 2mm
4. Install Next Board and Repeat Until Final Board
Install the next board by positioning lip over the positioning leg on the previous board and fix board using 30mm 10G screws as
required for the applicable wind loads. Ensure that the fixings are installed through the pre-punched slots.
TIP: After every 5th board, measure horizontally from both ends of the cladding to ensure consistent length. Adjust the angle of the
sixth board if needed for levelness, then proceed with fixing each subsequent board to maintain a level surface.
| Label | Description |
| A | Pre-punched slot |
| B | 30mm x 10G Self Tapping Panhead or Button head screws (galvanised or stainless steel) |
5. Rip and Install Final Board
The final cladding board might not be the right fit, so it needs to be ripped with a table saw. Measure the remaining space and cut the board accordingly for a proper fit.
| Label | Description |
| A | Cutting Line (if required) |
| B | Final Cladding Board |
6. Cut and Install Cover Strips
Measure horizontal Cover Strip Clip between the external face of the vertical members (see cutting tip on previous page), cut to length and snap in to fit.
| Label | Description |
| A | Cover Strip Base |
| B | Cover Strip Clip |
| Label | Description |
| A | Cover Strip Base |
| B | Cover Strip Clip |

S1 Clip-in Metal ceiling System
JMT-L4.2 U-Baffle System
JMT Aluminum Wall Cladding
Aluminum Honeycomb Panel
Air-Condenser Cover
Metal Heat Cover
Singapore Changi Airport T2 Arrival
Australia Marvrl Stadium City Edge
Enterprise Information Announcement
Construction Industry Solutions
About Jayminton
Contact US